Pre-Engineered Buildings

For a flexible and integrated building solution, consider the options.

Pre-engineered metal buildingsAt MC Industrial, we know you are looking for ways to maximize construction schedule and cost efficiencies, without sacrificing quality. Pre-engineered metal buildings (PEMB) are one effective option to achieve those results.

MC Industrial is one of the largest pre-engineered metal building contractors in America. In fact, Metal Construction News Magazine recently ranked MC Industrial as a Top US Metal Builder—ranked 22nd in tonnage and 22nd in square footage. An authorized Butler® Builder (under Butler Manufacturing, a BlueScope Steel company) since 2003, we are repeatedly recognized year after year as one of Butler’s High Performance Builders. In addition, MC Industrial is also a provider of Chief Buildings, if this is your preference.

By selecting MC Industrial for your project, you are selecting much more than just a pre-engineered building. You are choosing a true design-assist partner with proven experience working in the pre-engineered metal building market; a company with proven safety and quality results driven by our employee-owners; a team who will assist your project planning activities from design through construction; and, last but not least, you get peace of mind.

We achieve these results through an established five-step process:

  1. Early clarification of client needs and scope development
  2. Preliminary design development and cost feasibility studies
  3. Careful in-house oversight of final construction document development
  4. Proven construction management
  5. Occupancy facilitation and project closeout

At MC Industrial, we are committed to surpassing your expectations on every construction project. For more information on our pre-engineered metal building services, contact MC Industrial Pre-Engineered Building Director Brad Mayfield.

Related Projects


Arizona 4,000 Bed Prison Expansion

Arizona Department of Administration, Goodyear, Tucson and San Luis (two Sites), Arizona

MC Industrial worked simultaneously at four different locations, completing a quality project safely, on time, within budget.


New Fire Station

The Boeing Company, St. Louis, MO

A true testament to self-perform, the pre-engineered Boeing Fire Station buildings were completed in 10 weeks.