The term “commissioning” has evolved over the years to include not just testing and balancing of systems but a complete check of the design, installation and performance of major systems. Our Commissioning Program’s aim is simple: to ensure that all building systems are fully functional when you occupy the facility.
To that end, MC Industrial employs the following equipment start-up and commissioning procedures:
• We develop a Commissioning Responsibility Matrix outlining the roles of engineers, relevant contractors and the MC Industrial team.
• Our staff performs constructability reviews of your design and prepares checklists for testing, start-ups and system component verification.
• MC Industrial confirms that all equipment and materials delivered meet project requirements and are installed in accordance with manufacturers’ recommendations.
• We document that all equipment checklists are properly completed and that individual equipment is started under manufacturer’s supervision.
• MC Industrial supervises all testing and balancing procedures.
• We provide clear and comprehensive systems documentation and ensure that you staff is fully conversant in operation of all systems.
• MC Industrial secures all guarantees, warranties and operations manuals and forwards them to you along with as-built drawings and final paperwork.
• A MC Industrial field representative remains on-site for 60 to 90 days after occupancy to ensure that all systems are inspected, tested, balanced and operating properly.
|